Media walls in Ajax
Driveways and attached garages give the crew a clear path, and most installs load in through the garage. The wall is built and wired in the shop, delivered in sections and installed over [n] days, with the electrician making the final connections. A media wall holds the television, the fireplace and the equipment in one piece drawn for the room, with the cables inside the millwork.

Ajax, on the ground.
Ajax is dominated by subdivision houses from the 1990s onward, with a band of older streets near the lake. Newer open-plan rooms often need a media wall to give the space a centre; older living rooms usually have a chimney breast the millwork builds around. Kitchens, tall pantries, laundry rooms and closet fit-outs are the common jobs in Ajax.
Many kitchens in Ajax share the same builder footprint, so the gains come from the corner, the fridge wall and the run under the window.
Read more about custom cabinetry in Ajax or the full media walls page.
On the drawings, and on the quote.
- 01Television size, viewing height and seating distance set on the drawings first
- 02Fireplace opening built to the supplier's clearances [Kam confirms with the fireplace supplier]
- 03Hidden storage for equipment, with ventilation and cable routes inside the millwork
- 04Open shelves or closed doors, lit from above or below, wired in the shop
- 05Stone, slat or panel surround built and finished in the shop
- 06Install by our crew, with the electrician making the final connections
No figures published. The drivers, in order.
| Driver | What we look at |
|---|---|
| Fireplace surround | A fireplace adds an opening built to clearances, a hearth line and usually stone. |
| Hidden storage and doors | Closed storage for equipment adds boxes, doors and ventilation; open shelves are the lighter line. |
| Lighting | Shelf lighting and a backlit panel add wiring, drivers and an electrician's connection. |
| Stone or slats | A slab surround or a wall of solid slats changes the material line more than any colour. |
Shelf count and the finish colour barely move it. The fireplace, the stone and what the wall hides do.
Asked before the first call.
Can you build a media wall in a Ajax condo?
Yes. Condo media walls are drawn in sections that fit the elevator and the corridor, and we work to the building's delivery rules. [typical condo building rules confirmed per building]
How long does a media wall take in Ajax?
[n] weeks from signed drawings to install, then [n] days on site. Fireplace and television model numbers at the start keep that date.
How messy is an install day?
The crew puts down floor protection, works from the truck rather than staging boxes through the house, and cleans up at the end of each day. Old cabinets come out first if we are removing them, and offcuts and packaging leave with us. Dust from countertop templating and plumbing belongs to those trades.
Can you match new cabinetry to what we already have?
We can match a painted finish closely and we can match a door profile. Wood grain and older factory finishes are harder, because they change as they age. The honest answer is that a match is easiest when the new work sits in a different room. We tell you at the sample stage which way it will go.


